Reconstruction of NY Routes 441 & 250 $8.45 million
The project involved full depth reconstruction & widening of approximately 3.75 Km and or 16 Km lane widening of Penfield Rd/Fairport Webster Rd; including
left/right and center turn lanes, extensive utility relocation, storm drainage, water mains, traffic signals, side walks, stripping, staged construction &
protection of traffic. |
 |
Reconstruction of NY Route 18: Latta Road, Monroe County $14.8 million
The project involved reconstruction and widening of 8 Km urban arterial. Existing two lanes pavement was widened to
5 plus lanes with left/right and center turn lanes, extensive utility relocation, drainage and onsite traffic was maintained. |
 |
Bridge Replacement Route 414 over Interstate I-90 $2.62 million
The project entailed replacement of an existing four span bridge (192 ft.)
with a two span continuous bridge. The bridge was designed for seismic, the construction was staged to maintain traffic. |
 |
Bridge Replacement: Interstate I-90 over Canandaigua Inlet $2.6 million
The project entailed replacement of existing two spans, 142 foot long bridge with a single span,
multi girder bridge. The construction was staged to maintain traffic on mainline. |
 |
Reconstruction of Routes 5 & 249, Towns of Eden & Bryant $8.5 million
The project involved 2.25 Km full depth reconstruction, resurfacing, replacement of two bridges (Conrail & Delaware Creek),
2 box culverts, 8 cross culverts, improvements to intersections of Rte. 5 at Hall Rd. & Lake St., over 9,000 meters of closed drainage,
420 drainage structures, traffic signals, 3500 meters of water main, signs, stripping, hazardous waste and asbestos removal, landscaping,
maintenance and protection of traffic, utility relocation/coordination. |