Civil/Site Engineering Projects 

1/3
Town of Pittsford - Village Parking Study

PDG studied the site and traffic circulation patterns, developing several concepts to address the noted problems in a free-form, charrette-type approach while keeping within the boundaries of the Town and Village zoning requirements.  The goals of this study were to:

  • Increase parking capacity

  • Improve site navigation, vehicular circulation, and safety

  • Improve site access

  • Reduce points of vehicular conflict

1/2
Rochester City School District
School #8 Little League Baseball Field 

The School #8 2013-2014 Capital Improvements Project involved the design of a new little league baseball field and replacement of synthetic playground surfacing and equipment.

1/2
Rochester City School District
School #12 Facilities Modernization Plan

 

Services included preparation of site demolition and erosion and sediment control plans; sidewalk replacement and parking lot addition; grading design; design, permitting and regulatory agency approval for storm and sanitary sewer extensions; and design, permitting and regulatory agency approval for new fire and domestic water services.