North Division Street Bridge Replacement 

The project will replace the existing bridge with a wider, two span continuous steel multi-girder bridge constructed on an improved horizontally curved alignment. The bridge will feature decorative bridge railings and light fixtures, as well as form-lined concrete to match the existing stone walls in the project area. The new alignment will correct the existing intersection alignment problem, improving the level of service and safety. The project also includes the addition of an additional turn lane at NYS Routes 5 and 20, the reconstruction of an at-grade railroad crossing, and the construction of a node for the Owasco River Greenway Trail. 


The scope of services includes survey and mapping, hydraulic analysis, preliminary highway and bridge design, public information meetings, design report (Phases I-IV), and preparation of final highway and bridge plans, specifications, and estimates (Phases V-VI). 

 

  • LinkedIn
  • Instagram
  • Facebook - White Circle